Entraco Marine Engineering PTE LTD

Surface preparation will be carried out by ultra-high pressure hydro-jetting (UHPWJ) starting from the first fabricated block stages to its final product deliveries of all seven drillships in 2019.

All drillships will be built based on the Jurong Espadon design, which represents the next generation of high-specification drillships with advanced capabilities for operation efficiency and ultra-deepwater operations. The drillships are capable of operating at 10,000 ft water depth and drilling to depth of 40,000 ft, with accommodation facilities for crew of 180 personnel.

The seven drillships will be among the first in a series of drillships to be built in Brazil to cater for the oil and gas discoveries in the offshore giant pre-salt of the Santos Basin.

Mr Teng Choon Kiat, Entraco Venture Corporation Pte Ltd Managing Director, said: “We like to thanks Jurong Shipyard Pte Ltd for their continued supports and confidence in our capabilities and for selecting us as the painting contractor for the Brazil’s drillship building program”. 

© 2013 Entraco, All Rights Reserved Designed by: Adspress Media Pte Ltd